KEY FOCUS AREAS

ASSESSMENT OF THE IMPACT OF FACILITIES CONSTRUCTION ON ENVIRONMENT
- Grounds for EIA and Declaration of Intent
- Definition of physiographic features of area and platform (route) for building of design object
- Assessment of the impacts of planned activity on the natural environment
- Assessment of the impacts of planned activity on the social environment
- Assessment of the impacts of planned activity on the technogenic environment
- Definition of complex actions for environmental safety
- Assessment of the impact on the environment during building
- Statement of the ecological consequences of activities

GEOLOGICAL ENGINEERING SURVEYS
- Drilling of engineering-geological bores on land and over water
- Drilling of engineering-geological bores in hard-to-reach areas (slopes, underground, etc.) including inclined drilling
- Drilling of hydrological bores
- Core penetration test
- Stamp tests in bores at great depth under pile foundation. Pile test by static load
- Inspection of soil and ground waters
- Inspection of foundation soil of existing buildings and constructions
- Office treatment of materials

GEODESIC ENGINEERING SURVEY
- Collection and analysis of current operational, design and other source documentation
- Topographical survey with creation of three-dimensional digital plans
- Survey of high-altitude and horizontal position of utility lines and constructions
- Specialized engineering-geodesic measurement works of engineering structures
- Hydrographic works from small rivers to estuaries, water containment areas and storages with use of digital echo-sounder and satellite GPS equipment
- Hydrologic investigations
- Creation of geodesic networks of special purposes for building and upkeep of buildings and constructions
- Providing implementation engineering-geodesic documents

DESIGN OF INHABITED AND RESIDENTIAL PROJECTS
- Buildings and constructions of any form in plan view and rendition view
- Development of effective versions of constructive building schemes
- Arrangement of buildings constructed with monolithic, precast, metal frameworks
- Design of buildings in constrained building conditions

DESIGN OF INDUSTRIAL FACILITIES
- Steel-reinforced concrete wide-span frameworks with use of effective precast constructions
- Design of steel-reinforced concrete monolithic frameworks
- Design of metal frameworks of buildings

INSPECTION AND TESTING OF BRIDGES, OVERPASSES
- Technical inspection and assessment of building structural condition
- Complex inspection of artificial constructions
- Consultations of specialists in inspection of bridges and other artificial constructions

DESIGN OF ROAD AND PEDESTRIAN BRIDGES OF ANY COMPLEXITY
- Bridge superstructures with use of effective steel-reinforced concrete precast and pre-stressed beams
- Monolithic pre-stressed superstructures are constructed by the «post-tension» method
- Metal superstructures
- Firm steel-reinforced concrete superstructures
- Monolithic, precast, precast and cast-in-situ structural supports

DESIGN OF TRANSPORT FACILITIES
- Breast walls on pile and natural basis with use of geosynthetic materials
- Overpasses, viaducts
- Railway bridges
- Tunnels (non deep emplacement)
- Enterprises and car service facilities
- Industrial bases and construction organizations

DESIGN OF STATE AND LOCAL HIGHWAYS
- Selection of road fabric designs for traffic areas and paving on sidewalks
- Relaying of existing engineering networks
- External lighting
- Traffic organization
- Pedestrian zones
- Means for traffic regulation in pedestrian zones
- Improvement and small architectural forms

DESIGN OF STATE AND LOCAL HIGHWAYS
- State and local highways
- Motorways
- Municipal roads
- Traffic junction points and interchanges
- Highways in industrial, commercial and residential areas